A load line of a ship is assigned by the().
- Aminerals management service
- BDepartment of energy
- Ccorps of engineers
- Da recognized classification socitey approved
A load line of a ship is assigned by the().
1、A load line of a ship is assigned by()
A load line of a ship is assigned by().AMinerals Management ServiceBDepartment of EnergyCCorps of EngineersDA recognized classification society approved
2、If the result of loading a vessel is a
If the result of loading a vessel is an increase in the height of the center of gravity,there will always be an increase in the().Ametacentric heightBrighting armCrighting momentDvertical moment
3、()is a full nautical record of a ships
()is a full nautical record of a ships voyage, written up at the end of each watch by the officer of the watch.ASea protestBDeck logCAccident reportDSeamans book
4、A line of position formed by sighting
A line of position formed by sighting two charted objects in line is called a(n)().Arelative bearingBrange lineCtrack lineDestimated positio
5、When a ship is fully loaded, it needs
When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine...
6、In a storm,the leeward lines of a ship
In a storm,the leeward lines of a ship’s mooring system will().Apull the unit in the same direction that the weather is pushing itBpull th...