When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()

  • ADraft and trim
  • BLimits of the bending moments
  • CRate of discharging
  • DRate of loading
参考答案
参考解析:
分类:液体散货运及有关规则题库
相关推荐

1、When a vessel sees the other ahead or

When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line...

2、When loading a container vessel,the op

When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading contain...

3、During loading or discharging, the tal

During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.Aship ownerBship's officersCshippersDconsignor

4、()we have worked out the loading plan,

()we have worked out the loading plan,we shall start doing more revision work.AFor nowBEver sinceCNow thatDBy now

5、When loading or discharging dry mud or

When loading or discharging dry mud or cement,crew members should use goggles and().Afacial respirator maskBear plugsCrubberized bootsDfireman's outfit

6、During loading or discharging,the tall

During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.Aship ownerBship’s officersCshippersDconsignor