可学答题网 > 问答 > 特种货物运输及有关规则题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

In securing deck loads for an ocean to


In securing deck loads for an ocean tow,drill pipe should be().

  • Agalvanized to protect against corrosion
  • Bheld in place with heavy materials such as spare pendant wire
  • Climited to no more than five courses high
  • Dprovided with bulwarks at both ends of their bay
参考答案
参考解析:
分类:特种货物运输及有关规则题库
相关推荐

1、To “shore up” the main deck for the st

To “shore up” the main deck for the stowage of deck cargo means to().Aweld pad eyes on deck in proper position to secure the cargoBstreng...

2、A bridle for an ocean tow consists of(

A bridle for an ocean tow consists of().Atwo chains of equal lengthBa single nylon pendant rove through a heavy ring free to move on the p...

3、The purpose of the deck seal in an ine

The purpose of the deck seal in an inert gas system is to prevent().Aflammable vapors from entering machinery spaceBflue gas escaping to atmosphereCinert gas escaping to atmosphereDair entering inert gas system

4、The opening in the deck beneath the an

The opening in the deck beneath the anchor windlass that leads to the chain locker is the().Ahawse pipeBfall pipeCdrop-pipeDspill pipe

5、The reason for the obligation to load

The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.AisBmakesChasDtake

6、Prior to taking over the deck watch in

Prior to taking over the deck watch in port,the relieving officer shall not be informed by the officer in charge of the deck watch as to()...