问题

(1) is a method of constructing a pro


(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.空白(3)处填()

  • AA.F-S
  • BF-F
  • CS-F
  • DS-S
参考答案
参考解析:

暂无解析

分类:专业英语题库,高级信息系统项目管理师题库
相关推荐

1、(1) is a method of constructing a pro

(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities...

2、(1) is a method of constructing a pro

(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities...

3、Construction of a ne

Construction of a new automobile parts manufacturing facility has recently been completed. Th...

4、The(1) is a general description of th

The(1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the ...

5、One method of constructing large marin

One method of constructing large marine diesel engines and reducing the total engine frame weight is through ().Acasting interlocking components...

6、If a vessel of special construction ca

If a vessel of special construction cannot fully comply with the Rules,her degree of compliance shall be determined by().AIMOBThe owners of the vesselCThe governmentDThe builder