可学答题网 > 问答 > 船舶结构基本知识题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

The pivoting point of a fully loaded v


The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().

  • Aright at the bow
  • Bone-third the length of the vessel from the bow
  • Cone-half the length of the vessel from the bow
  • Dtwo-thirds the length of the vessel from the bow
参考答案
参考解析:
分类:船舶结构基本知识题库
相关推荐

1、Compliance with the terms of the load

Compliance with the terms of the load line certificate on a ship is the responsibility of the().ABallast Control OperatorBBarge SupervisorCMaster or Offshore Installation ManagerDoperators representative

2、If the result of loading a vessel is a

If the result of loading a vessel is an increase in the height of the center of gravity,there will always be an increase in the().Ametacentric heightBrighting armCrighting momentDvertical moment

3、When a ship is fully loaded, it needs

When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine...

4、●Load factor a of the hash table is ap

●Load factor a of the hash table is approximately (66) .A0.54B0.35C0.28D0.71

5、The primary purpose of a load line is

The primary purpose of a load line is to establish required().Aminimum freeboardBGMCtransverse stabilityDfresh water allowance

6、A V-shaped ripple with the point of th

A V-shaped ripple with the point of the V pointing upstream in a river may indicate a().Asubmerged rock,not dangerous to navigationBsunken wreck,not dangerous to navigationCtowed-under buoyDAll of the above