可学答题网 > 问答 > 航次租船合同题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

The Vessel is()for heavy cargoes and c


The Vessel is()for heavy cargoes and can sail with alternate holds empty.

  • Aintensified
  • Bstrengthened
  • Cincreased
  • Dsolid-built
参考答案
参考解析:
分类:航次租船合同题库
相关推荐

1、For a general cargo ship, is not the n

For a general cargo ship, is not the necessary certificate/document that the PSCO will examine()ASurvey Report FileBMinimum Safe Manning documentCCertificates of CompetencyDInternational Oil Pollution Preventio

2、The cargo is now and()found short duri

The cargo is now and()found short during discharging at your port.AthanBthenCwhen the line pull reaches the breaking strengh of the fallDwhile

3、For an upright vessel, draft is the ve

For an upright vessel, draft is the vertical distance between the keel and the ().AwaterlineBfreeboard deckCPlimsoll markDamidships sectio

4、()is for the operation ordering and th

()is for the operation ordering and the information exchange by Internet among the firms.AOrder ProcessingBOrder makingCElectronic Order System (EOS)DOrder form

5、For an upright vessel,draft is the ver

For an upright vessel,draft is the vertical distance between the keel and the().AwaterlineBfreeboard deckCplimsoll markDamidships sectio

6、A vessel is entering port A for the fi

A vessel is entering port A for the first time and has a Pilot conning the vessel. The Master is unsure that the Pilot is taking sufficient...