The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().
- Aon a tug standing by
- Bavailable by contract with the shore facility
- Ckept at the shoreside hose connection during transfer
- Dkept in a protected shoreside location readily accessible