Using the Tivoli Dynamic Workload Console, what are two ways to change the priority of a job?()
- A Open the "Set Priority" panel from the job properties.
- B Change the priority of the job stream that contains the job.
- C Select the corresponding action from the Monitor jobs task panel.
- D Open the job stream properties and drill down to the job priority panel.
- E The priority of a job can only be changed from the Workload Designer.