With the shell and cap assembled as for running, a check must be made that the clearance between the cap and the housing ().
- Ahas a nip
- Bis large enough
- Cis zero
- Dare suitable
With the shell and cap assembled as for running, a check must be made that the clearance between the cap and the housing ().
1、With a () load the voltage and current
With a () load the voltage and current are in phase.Apure resistanceBcapacitiveCinductiveDNone of the above
2、The cap and new shell are tightened up
The cap and new shell are tightened up and then removed and the thickness of the wire measured by ().Aa bridge gaugeBa micrometerCa thermometerDa indicator
3、He robbed the bank and was sent to()fo
He robbed the bank and was sent to()for three years.Athe prisonBaprisonCprisonsDpriso
4、As soon as you hear the fire and emerg
As soon as you hear the fire and emergency signal, you should ensure that the ().Aring buoys are thrown overboardBengines are stoppedCfire pumps are startedDlife preservers have been issued to everyone
5、Washing the food down with water as a
Washing the food down with water as a substitute ______chewing is not a good habit.A ofB forC toD from
6、The bearing cap and shell are replaced
The bearing cap and shell are replaced and tightened up until ().Athe nip is zeroBthe nap is zeroCthe gap is correctDthe clearance is correct