The()process analyzes the effect of r


The()process analyzes the effect of risk events and assigns a numerical rating to those risks.

  • ARiskldentification
  • BQuantitative RiskAnalysis
  • CQualitative RiskAnalysis
  • DRisk Monitoring and Control
参考答案
参考解析:

该题的关键词为"analyzes the effect of risk, numerical rating",其语句结构为"The()一process(主语)analyzes(谓语)the effect of risk events(宾语)and assigns(并列谓语)anumerical rating to those risks(并列宾语)",含义为"什么过程分析风险事件的后果,并且为这些风险指定数值级别",容易判断题目描述的是量化风险分析的特点,应该选择选项B。

分类:专业英语题库,高级信息系统项目管理师题库
相关推荐

1、In the process of the shafting managem

In the process of the shafting management, special attention should be paid to()Aon the sailing, the water in the aft peak tank should be e...

2、● The process of software development

● The process of software development doesn’t include(72) .(72)Averification functionBwriting codeCmanagement functionDvalidation function

3、In the process of communication requir

In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths...

4、The(75)process analyzes the effect of

The(75)process analyzes the effect of risk events and assigns a numerical rating to those risks.ARisk IdentificationBQuantitative Risk AnalysisCQualitative Risk AnalysisDRisk Monitoring and Control

5、During the process of loading, damages

During the process of loading, damages to cargo can be reduced to minimum by().Ashippers who deliver the cargo to the ship on timeBstevedores...

6、The()Process Group consists of the pr

The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.APlanningBExecutingCMonitoring and ControllingDClosing