可学答题网 > 问答 > 物流英语综合练习题库,物流员(四级)题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

()is the management system to control


()is the management system to control the material consumed reduce inventory in the manufacture company.

  • AA.DPR
  • BB.LPR
  • CC.MRP
  • DD.ERP
参考答案
参考解析:

暂无解析

分类:物流英语综合练习题库,物流员(四级)题库
相关推荐

1、() is software to manage the relations

() is software to manage the relationship and communication between customers and suppliers.ACRMBMRPCERPDSCM

2、● Configuration management is the proc

● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires...

3、You need to give the MANAGER role the

You need to give the MANAGER role the ability to select from, insert into, and modify existing rows in the STUDENT_GRADES table. Anyone given...

4、()is the management system to control

()is the management system to control the material consumed, reduce inventory in the manufacture company.ADRP (Distribution Resource Planning)BLRP (Logistics Resource Planning)CMRP (Material Requirements Planning)DERP (Enterprise Resource Planning)

5、Requirements management is the proces

Requirements management is the process of ()AA、communicatingBB、collectingCC、filingDD、documenting

6、The controlling depth of the river is(

The controlling depth of the river is().Athe minimum depth of the river prescribed in the channel maintenance programBthe edge of a dredged c...