An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()
- AAdd Rear Door Heat eXchanger
- BAdd fans to the top of the racks
- CIncrease circulation from Data Center raised floor
- DChange to perforated door