可学答题网 > 问答 > 紧急通信题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

Each emergency generator on a mobile o


Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().

  • Aone hour
  • Btwo hours
  • Cten hours
  • Dfour hour
参考答案
参考解析:
分类:紧急通信题库
相关推荐

1、The emergency generator or emergency b

The emergency generator or emergency battery is connected to() on most large ships.Adistribution boardsBsection boardsCemergency switch boardsDmain switch board

2、Each fire hose coupling on a ship must

Each fire hose coupling on a ship must have threads that meet the specifications of the().AAmerican Petroleum InstituteBNational Standard Firehose CouplingCAmerican Society of Mechanical EngineersDUnderwriter's Laboratories,Inc

3、Each open lifeboat carried on a vessel

Each open lifeboat carried on a vessel on an international voyage must have().Ahand-propelling gearBa davit span with at least 2 lifelinesCa mast and a sailDa motor

4、Each EPIRB required on a ship shall be

Each EPIRB required on a ship shall be tested using the integrated test circuit and output indicator every().AweekBtwo weeksCmonthDtwo month

5、The signal for a fire emergency on an

The signal for a fire emergency on an OSV is().Aa 30 second on 30 second off alternating signalBthe continuous blast of the ships whistle f...

6、Each ship shall carry on board a shop

Each ship shall carry on board a shop security plan approved by ()Athe chief engineer officerBthe master of the shipCthe manager of the companyDthe Administratio