问题

involves comparing actual or planned p


involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it,and can be within the same or in another application area.

  • AMetrics
  • BMeasurement
  • CBenchmarking
  • DBaseline
参考答案
参考解析:

解析:基准分析涉及到将实际或计划的项目实践与其他项目进行比较,以产生改进的思想并提供一个测量绩效的基准。其他项目可以是执行组织内部的,也可以是外部的,可以是同一个应用领域的,也可以是其他应用领域的。

分类:其他
相关推荐

1、Because the actual center of some plan

Because the actual center of some planets may differ from the observed center,the navigator applies a correction known as the().Aphase correctionBrefraction correctionCsemidiameter correctionDaugmentation correctio

2、()involves comparing actual or planne

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis ...

3、When planning the loading or dischargi

When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()ADraft and trimBLimits of the bending momentsCRate of dischargingDRate of loading

4、 The()technique involves using p

The()technique involves using project characteristics in a mathematical model to predict total project cost. Models can be simple or complex.AcostaggregationBreserve analysisCparametricestimatingDfunding limit reconciliation

5、A process of comparing the actual perf

A process of comparing the actual performance of a machine with the intended performance, and the adjusting the machine to reduce and eventuall...

6、Any partial loss or damage shall be()p

Any partial loss or damage shall be()pro rata on the basis of such declared value.AadjustedBarrangedCdeterminedDfixed