Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()
- AUse the 60 Amp line cords
- BChange the 100 Amp connector to a 60 Amp circuit
- CSubmit an RPQ to order the p5 590 with 100 Amp power cords
- DChange the configuration and order the p5 590 with the 100 Amp power cord