When you adjust a thermostatic expansion valve, ().
- Arefrigerant must be bled off the sensing line before adjustments are made
- Ball refrigerant must be pumped into the receiver before adjustments are made
- Ctime must be allowed for conditions to stabilize in the evaporator before further adjustments are made
- Dall refrigerant must be routed through the dehydrator while changing the superheat setting