A ship under construction or major rep


A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.

  • Ahammering and jarring
  • Bvibration and pounding
  • Cvarying magnetic fields
  • Dstable or permanent magnetism of the shi
参考答案
参考解析:
分类:磁罗经与陀螺罗经的使用题库
相关推荐

1、In the ship construction portfolio,mat

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().Achemical and physical...

2、Under ISPS Code the ship to which it a

Under ISPS Code the ship to which it applies has to carry()Aan International Ship Security CertificateBan International Oil Pollution CertificateCa Safety Management CertificateDan International Ballast Water Management Certificate

3、In case a ship is in emergency or dist

In case a ship is in emergency or distress in any of 4 areas, it is required to use the continuous()alert.AMF/HFBSARTCEPIRBDany of A, B, C

4、In deciding to detain a ship or not, t

In deciding to detain a ship or not, the PSCO would better not()Amake his decision independentlyBrequest the owner’s representative to pr...

5、On a ship,a fixed carbon dioxide or ot

On a ship,a fixed carbon dioxide or other approved system must be installed().Awhere oil or chemical drums are storedBin all battery storage locationsCin paint lockersDin all of the above locatio

6、The purpose of sheer in ship construct

The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge