Clearances of bridges and overhead cables below Bonneville Dam refer to heights in feet above mean ().
- Alower low water
- Bhigh water
- Clow water
- Dsea level
Clearances of bridges and overhead cables below Bonneville Dam refer to heights in feet above mean ().
1、Marks and Nos.,Number and kind of pack
Marks and Nos.,Number and kind of packages,description of goods should be declared in ().ASHIP'S STORE LISTBPERSONAL EFFECTS LISTCCARGO DECLARATIONDGENERAL DECLARATION
2、The next-to-last shot of an anchor cab
The next-to-last shot of an anchor cable is usually painted().AwhiteBinternational orangeCyellowDred
3、Bridge orders must be () and a record
Bridge orders must be () and a record of any required changes in speed and direction should be kept.Aslowly carried awayBcarried out with a period of delayCpromptly carried outDpaid by the captai
4、The record of tests and inspection of
The record of tests and inspection of fire fighting equipment on board a ship must include().Athe name of the person conducting the testBthe weight of the chargeCrecommendations for the next testDAll of the above
5、Cold clearances between the skirt of a
Cold clearances between the skirt of an aluminum piston and the cylinder liner is about ()Atwice as large as with a cast iron pistonBthe sa...
6、When entering the bridge,pilots of the
When entering the bridge,pilots of the Suez Canal want the master of the ship to fill in ().ATheir yellow bookBTheir seaman's bookCTheir Pilotage formDTheir bill of health