Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
- Ais
- Bare
- Cwill be
- Dshall be
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
1、Goods will be shipped ( )30 days after
Goods will be shipped ( )30 days after receipt of the L/C.A toB forC onD with in
2、汇票的付款日期为“At 30 days after sight”,这种规定方
汇票的付款日期为“At 30 days after sight”,这种规定方式属于()AA.见票后若干天付B.出票后若干天付款C.指定日期付款D.提单签发后若干天付款
3、After several days of heavy rain the r
After several days of heavy rain the roof()with a loud noise, crashing (坠落) onto the ground.Acame outBcame downCcame onDcame at
4、A refusal to work part of the day only
A refusal to work part of the day only may()to be a strike even though such refusal is not in breach of contract.AholdBbe heldCbe maintainedDbe reported
5、After making changes to the profile fo
After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the...
6、The lay of a line refers to().
The lay of a line refers to().Aits normal location of stowageBthe direction of twist in the strandsCthe manner in which it is coiledDthe manner in which it is rigged