目录: 标题| 题干| 答案| 搜索| 相关
问题

6The construct cobegin Statement1; Sta


6The construct cobegin Statement1; Statement2; coend means Statement1 and Statement2 are to be executed in parallel. The only two atomic actions in this construct are loading thevalue of a variable and storing into a variablE.For the program segment x:=0; y:=O; cobegin begin x:=l; y:=y+x; end; begin y:=2; x:=x+3; end coend Which of the following indicate(s) possible values for the variables when the segment finishes execution? Ⅰ.x=1,y=2 Ⅱ.x=1,y=3 Ⅲ.x=4,y=6

  • A
  • BⅠ and Ⅱ
  • CⅠ and Ⅲ
  • DⅡand Ⅲ
参考答案
参考解析:
分类:其他
相关推荐

1、The construction portfolio may be incl

The construction portfolio may be included as part of the ship().Ageneral plansBoperating manualCbuilders documentationDCCS file

2、In the ship construction portfolio,mat

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().Achemical and physical...

3、In vessel construction,a greater numbe

In vessel construction,a greater number of watertight bulkheads results in().Aincreased capacity to set flooding boundariesBdecreased capacity to set flooding boundariesCreduced compartmentationDgreater deck load capacity

4、建构工具箱(construction kits)

建构工具箱(construction kits)

5、Regarding constructing a&#

Regarding constructing a good encryption algorithm, what does creating an avalanche effect i...

6、Construction of a ne

Construction of a new automobile parts manufacturing facility has recently been completed. Th...