滨(shore)
-
1、Shore power must be() during dock repa
Shore power must be() during dock repair.AdisconnectedBswitched offCcut offDconnected
-
2、The term LEE SHORE refers to the().
The term LEE SHORE refers to the().Ashore on the lee side of the vesselBshore that is in the leeCwestern shore of the Lesser AntillesDshore in a harbor of refuge
-
3、Wale shores would be used when drydock
Wale shores would be used when drydocking a vessel with().Atumble homeBexcessive deadriseCexcessive trimDa list
-
4、The objective of shoring a damaged bul
The objective of shoring a damaged bulkhead is to().Aforce the warped, bulged, or deformed sections back into placeBsupport and hold the area in the damaged positionCwithstand subaequent additional damagedDmake a watertight seal at the damaged area
-
5、The objective of shoring a damaged bul
The objective of shoring a damaged bulkhead is to().Aforce the warped,bulged,or deformed sections back into placeBsupport and hold the area in the damaged positionCwithstand subsequent additional damageDmake a watertight seal at the damaged area
-
后滨(back shore)