目录: 标题| 题干| 答案| 搜索| 相关
问题

●Load factor a of the hash table is ap


●Load factor a of the hash table is approximately (66) .

  • A0.54
  • B0.35
  • C0.28
  • D0.71
参考答案
参考解析:

【解析】Hash表的装载因子大约是0.54。

分类:其他
相关推荐

1、A load line of a ship is assigned by()

A load line of a ship is assigned by().AMinerals Management ServiceBDepartment of EnergyCCorps of EngineersDA recognized classification society approved

2、The best way to determine if a load is

The best way to determine if a load is within maximum lift limits is to use().Aa boom angle indicatorBa load weight indicatorCmaterial invoices for shipping weightsDprior experience with similar lift

3、Grammar is a description of the()of a

Grammar is a description of the()of a language and the way in which linguistic units such as words and phrases are combined to produce sentences in the language.

4、The(1)is a general description of the

The(1)is a general description of the architecture of a workflow management system used by the WFMC,in which the main components and the asso...

5、The power factor is a measure of the p

The power factor is a measure of the phase difference between voltage and current and is expressed as the() of the phase angle.AsineBcosineCtangentDcotangent

6、A load line of a ship is assigned by t

A load line of a ship is assigned by the().Aminerals management serviceBDepartment of energyCcorps of engineersDa recognized classification socitey approved