可学答题网 > 问答 > 液化气体与IGC规则题库
目录: 标题| 题干| 答案| 搜索| 相关
问题

When fueling has been completed().


When fueling has been completed().

  • Athe fuel tank fill pipe should be left open to allow vapors to vent from the tank
  • Bthe engine should be started immediately to prevent vapor lock in the fuel line
  • Call hatches should be opened and all compartments should be ventilated
  • Dopen the fuel line and drain a small amount of gasoline into the bilge to clear the line of sediment
参考答案
参考解析:
分类:液化气体与IGC规则题库